Before the floor is paved, be sure to prepare for moisture protection so that the floor is beautiful and wearable. These are the details that can’t be ignored. Doing every detail can bring more warmth and comfort to your loved one. Here are the tips for everyone, what should be prepared before the paving, what details need to pay attention.
First, the materials should be kept properly.
Flooring products should be laid flat at room temperature for two days before paving, and then paved work. In order to better protect the floor from moisture, these flooring materials should be protected from venting, dry, and protected with a plastic film. If there are damp wood flooring products, then these should not be used. You can’t dry the floor after the damp in order to save money, and then continue to use it. This can cause the floor to become moldy or reduce its life.
Second, the materials should be prepared for moisture protection.
After purchasing the wood flooring products, it is necessary to carry out a moisture-proof treatment before laying. A moisture-proof protective lacquer can be applied to the back of the floor to prevent the paved floor from being wet, which then affects the overall floor, causing problems with the floor.
Third, the floor should be cleaned before laying the wooden floor.
Whether it is solid wood flooring or solid wood composite flooring, the indoor floor should be cleaned before re-paving. First, clean the cement and sand on the ground first. Secondly, clean the floor and keep it clean. Finally, before the paving, brush a layer of diluted cement slurry to remove the stain on the floor. Paving.
I learned these small tricks and can effectively prevent the wooden floor from getting wet before laying the floor, which will have a negative impact on future use.
Post time: Jun-13-2022